SFTF NEPA Review
Checklist
Instructions: This form must be completed for each
operation at the South Florida Testing Facility with the potential to impact
the environment. This includes but is not
limited to range operation, site maintenance and minor construction, and major
site improvements/modifications. This
form must be submitted to the site environmental manager prior to the
operation, and during the project planning stage. This will allow sufficient time for
environmental review and any necessary documentation.
Project
POC Phone
Number Code/Organization
Proposed
Action (brief description, attach test plan if available) Repetitive? __ Yes
__ No
Location
of Proposed Action
60
ft range 600 ft range 1200 ft range Off-site ___
___ ___ ___ Location:
____________________________
Proposed
Start Date Completion
Date/On-going Operation
Category
(check all that apply)
___
ISE ___R&D ___T&E ___Test Facility M&R ___ Fleet Support
___
Base Operating Support ___Acoustics ___Construction ___
Other:
___ NEPA Documentation was done externally
(attach copy)
For
acoustic operations, provide the following:
___
Passive ____ Active
Source
frequency (kHz): ___________________________________________________________
If
classified, provide range of frequencies that include project
Source
output level (dB//μPa at 1 meter):
______________________________________________
If classified,
provide range of source level that includes project
Source
directivity: ________________________________________________________________
Length
of transmission, duty cycle, etc.:
______________________________________________
Any
other acoustic characteristics that may aid in environmental analysis:
___________________
_______________________________________________________________________________
Signature
of Project P.O.C. Submission
Date
____________________
Fax
copy of this form to Bill Baxley, SFTF, (954) 926-4031, or email
baxleywe@nswccd.navy.mil